Human Factors and Interface Design

Team Violet
Alarm Clock Design Project

 

Phase Deliverables

Phase 1: Personas/Goals/Task Analysis (Thursday 17 February 2005)
Phase 2: Scenarios and Preliminary Design (Monday 28 February 2005)
Phase 3: Low Fidelity Prototypes (Monday 14 March 2005)
Phase 4: First Interactive Prototype (Friday 1 April 2005)
Heuristic Evaluation (Monday 11 April 2005)
Phase 5: Second Interactive Prototpye (Tuesday 19 April 2005)
Pilot Usability Study (Monday 25 April 2005)
Phase 6: Third Interactive Prototype (Monday 2 May 2005)
Final Powerpoint Presentation: (Monday 2 May 2005)
Final Project Writeup (Tuesday 10 May 2005)

 

A project for the HFID course at the Franklin W. Olin College of Engineering.

 

Here is a link to our group Wiki Page.