Indigo

Re-Building the Student Information System

View Current Prototype (Olin internal-only)

Phase deliverables:


phaseversionslast edit
1: Project ProposalCurrent (Apr 17, 2005) [all]stylesheet
2: ProtocolCurrent (Apr 17, 2005) [all]stylesheet
3: Personas, Goals, Task AnalysisCurrent (Apr 17, 2005) [all]stylesheet
4: Scenarios and Preliminary DesignCurrent (Apr 17, 2005) [all]stylesheet
5: Low Fidelity PrototypeCurrent (Apr 17, 2005) [all]stylesheet
6: Interactive PrototypeCurrent (Apr 17, 2005) [all]stylesheet
7: Heuristic Evaluation [all]creation
8: Second Interactive PrototypeCurrent (Apr 20, 2005) [all]updated prototype use instructions
9: Pilot Usability StudyCurrent (Apr 25, 2005)[all]creation
10: Third Interactive PrototypeCurrent (May 08, 2005)[all]creation

Please note: From Scenarios and Preliminary Design onwards, teamwork data is tracked on our wiki site.

Members:


Ben Donaldson
Katie Rivard
Steve Shannon